Controllers / East Training Grounds
controller

East Training Grounds

Make : HYDRO-WISE
Model type : pro-c
Model Name : AQUA GEN-X
Denver, CO

TOTAL STATIONS

22

CURRENT FLOW

LAST INSPECTION

NEXT RUN

Connected Stations

Total : 8
STATION NUMBER
LOCATION
STATUS
TIMING
FLOW
01
East Training Grounds - Zone 1
Watering
20m (8m left)
2.5 GPM
02
East Training Grounds - Zone 2
Idle
5 GPM
03
East Training Grounds - Zone 3
Idle
7.5 GPM
04
East Training Grounds - Zone 4
Watering
20m (8m left)
10 GPM
05
East Training Grounds - Zone 5
Idle
12.5 GPM
06
East Training Grounds - Zone 6
Idle
15 GPM
07
East Training Grounds - Zone 7
Watering
20m (8m left)
17.5 GPM
08
East Training Grounds - Zone 8
Idle
20 GPM

Maintenance History

Valve Replacement - Flow Valve

Ref: MH-2025-001

Replaced worn valve and verified flow rates. System operating within spec.

Before Valve Replacement - Flow Valve
Before
After Valve Replacement - Flow Valve
After
MV

Marcus V.

Technician

Calendar
FEB 20, 2025

Inspection - General

Ref: MH-2025-002

Quarterly inspection completed. No issues found.

Before Inspection - General
Before
After Inspection - General
After
SC

Sarah C.

Technician

Calendar
FEB 18, 2025

Leak Repair - Pipe Joint

Ref: MH-2025-003

Sealed joint at sector 7. Flow restored to nominal levels.

Before Leak Repair - Pipe Joint
Before
After Leak Repair - Pipe Joint
After
MV

Marcus V.

Technician

Calendar
FEB 15, 2025

Assigned Technicians

JD

John Doe

Technician

JS

Jane Smith

Technician

MB

Michael Brown

Technician

Programs & Scheduling

Program 1INACTIVE
Next Run :N/A (N/A)