Sites / Golden Gate Innovation Center
Site icon

Golden Gate Innovation Center

Location icon

San Francisco, CA

TOTAL CONTROLLERS

TOTAL CONTROLLERS

45

TOTAL STATIONS

TOTAL STATIONS

6

ACCOUNT OWNER ASSIGNED

ACCOUNT OWNER ASSIGNED

Rachel D. Smith

Assigned Controllers

Total : 6
#01

Hunter Pro-C – North Sector

Pro-C · Cascaded Controller

Stations

12 Stations

Location

north

#02

West Field Zone

Pro-C · Cascaded Controller

Stations

12 Stations

Location

west

#03

Stadium Outer Ring

Pro-C · Cascaded Controller

Stations

12 Stations

Location

east

#04

South Athletic Block

Pro-C · Cascaded Controller

Stations

12 Stations

Location

south

#05

Central Garden Controller

Pro-C · Cascaded Controller

Stations

12 Stations

Location

north

#06

East Training Grounds

Pro-C · Cascaded Controller

Stations

12 Stations

Location

east

Parts List

Bulk Upload (Optional)

Please use the exact format. Download Template

Loading parts...

Maintenance History

Valve Replacement - Flow Valve

Ref: MH-2025-001

Replaced worn valve and verified flow rates. System operating within spec.

Before Valve Replacement - Flow Valve
Before
After Valve Replacement - Flow Valve
After
MV

Marcus V.

Technician

Calendar
FEB 20, 2025

Inspection - General

Ref: MH-2025-002

Quarterly inspection completed. No issues found.

Before Inspection - General
Before
After Inspection - General
After
SC

Sarah C.

Technician

Calendar
FEB 18, 2025

Leak Repair - Pipe Joint

Ref: MH-2025-003

Sealed joint at sector 7. Flow restored to nominal levels.

Before Leak Repair - Pipe Joint
Before
After Leak Repair - Pipe Joint
After
MV

Marcus V.

Technician

Calendar
FEB 15, 2025

Inspection Overview

arrow
76%
34 / 45